For previous updates please visit: http://greenheartden.blogspot.com/2010/08/greengate-bridge-structure-update.html
Developed and managed by Marsh Street Arches and Garden Community Interest Company.
Wednesday, 15 September 2010
Greengate Bridge structure - water seepage
Following the recent meeting between our Project Coordinator Graham Bromley, Sam Cowsill - Network Rail Structures Mangement Engineer (Cumbria), and Tom Clark - AMCO Rail, it is understood that the water seeping through Greengate Bridge structure could possibly be contributing to the deteriorating condition of the structure. The water leakage may potentially be cause by i) blocked or damaged road drains on Greengate Street and/or ii) a leaking water service pipe in the structure of the bridge itself. The water pipes were identified in a drawing kindly provided by Sam Cowsill.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment