Greengate Street bridge structure - water seepage becomes worse

Inspite of the excellent work of AMCO Amalgamated Construction in conducting minor repairs (repairing and replacing loose and damaged brickwork, removing vegetation growing out of the structure and repointing)  to areas of brickwork on Greengate Street bridge structure, as commissioned by Network Rail, the water seeping through Greengate Street bridge structure is visible getting worse, as the videos below will hopefully demonstrate. These weres taken today, 12/10/2011, on the south side of the bridge structure, facing the Green Heart Den.




It has been suggested that as the seepage is visibly worse during and after rainfall that, in all likelihood, the source of the water is from the road surface and/or road drains above on Greengate Street.