Pages

Tuesday 7 February 2012

Green Heart Den attendances 2008 to present



There was a slight reduction in the number of attendances, particularly in 2011. This was due to large scale construction works in which we limited access for reasons of health and safety.

Among the works conducted during this time included:
  • The demolition and rebuilding of the back street wall.
  • The installation of new railings and gates.
  • Overhead work to install wires to the arbour.
  • Network Rail conducting overhead work to repair brickwork.


No comments:

Post a Comment