Pages

Sunday, 15 April 2012

Community grow your own scheme progress

Digging out the area to the left of the main entrance. New top soil will be added to this area on top of a geo textile membrane (the orange roll) and a protective mesh. Once this is in place the area will be planted with grass, wild flowers and edged with mixed shrubs.


Many of the stone chippings have now been spread throughout the hard surface area. Once levelled this area will be compacted and rolled in preparation for the final limestone dust top surface. In the foreground, the old raised planters are being recycled to make new compost bins.




No comments:

Post a Comment